About Aaron Dressel

This author has not yet filled in any details.
So far Aaron Dressel has created 3 blog entries.

XStim Consulting at URTeC 2022

2023-07-03T14:14:22+00:00

We know how important it is to stay on top of new technology in drilling and completion operations. By keeping up with the latest equipment and material advancements XStim Consulting can make better recommendations to our clients on how to drill and complete a well more efficiently. As Oil and Gas consultants we want to

XStim Consulting at URTeC 20222023-07-03T14:14:22+00:00

Efficiency in Acid Displacement

2023-07-03T14:14:26+00:00

This month we continue our 3 part series on engineering efficiency in completion operations with addressing acid displacement in frac pump times. Applying new concepts in acid displacement during wireline pump down operations allows us to place acid near the perfs, or displace acid entirely, after perforating for a stage. Doing this decreases the pump

Efficiency in Acid Displacement2023-07-03T14:14:26+00:00

Engineering Efficiency In Completion Operations

2023-07-03T14:14:26+00:00

Starting this February we will be releasing a 3 part series where we will identify areas in completion operations where time and materials can be saved. Areas that will be discussed are optimizing surface equipment by utilizing new technologies or ideas, applying new concepts for acid displacement, and the benefits in pumping simul-frac on multi well pads.

Engineering Efficiency In Completion Operations2023-07-03T14:14:26+00:00